Stan’s Obligatory Blog

1/4/2015

Checking in on the Metro Gold Line

Filed under: — stan @ 1:49 pm

This Sunday’s bike club ride is yet another installment of checking out the progress that Metro is making on building the Gold Line extension to Azusa. We first did this tour almost a year ago, when construction was under way, but not all that far along yet. And we’ve been looking in on it every few months since then. Since the completion of the track last October, work has shifted to finishing up the stations and putting up the overhead wires.

In Monrovia, we saw that the station looks almost complete, and they’ve made a lot of progress on the maintenance yard. The downtown station in Azusa looks more complete, and the station at the end by Citrus College is even starting to look like a station. Even the Irwindale station is making visible progress. When we first did this ride, it was just bare dirt and piles of rails and ties waiting to be assembled into track. Now, they’re starting to run test trains along the tracks to check clearances and such.

Maybe by next winter, we’ll be able to have a Metro Tour East ride that we can do on days when it might rain, since the train will be available as a bail-out option all the way out to Glendora.

43 miles.

Leave a Reply

Seals

Powered by WordPress